Dubai, UAE
Al Jalila Hospital
Aermec air handling units
Hospitals
Operating theatres, intensive care, imaging and wards all depend on central plant that runs around the clock, with no tolerance for downtime.

The challenge
A hospital mixes very different spaces under one roof: operating theatres with strict air requirements, imaging rooms with heavy equipment loads, and wards that must stay quiet and comfortable. All of it runs 24 hours a day, so maintenance has to happen without switching anything off.
Our approach
We design the central plant around redundancy first: duty and standby chillers, pumps and controls. Aermec air handling units and fan coils serve the clinical and patient areas, with precision units for imaging and IT rooms.
Aermec · 50 products
Air-cooled chillers & heat pumps
Outdoor chillers from 3 kW to 2.1 MW: scroll, screw and oil-free centrifugal.
Explore the range ›Aermec · 13 products
Air handling units
Modular and packaged AHUs, rooftop units and fresh-air treatment.
Explore the range ›Aermec · 22 products
Fan coil units
Hydronic terminal units for hotels, offices and residential towers.
Explore the range ›Aermec · 9 products
Heat recovery units
Ventilation with energy recovery, from 100 to 30,000 m³/h.
Explore the range ›Aermec · 3 products
Precision air conditioning
Close-control units for server rooms and data halls: DX and chilled-water.
Explore the range ›Delivered by Elec Qatar
Aermec worldwide
Aermec projects delivered by Aermec and its partners, not by Elec Qatar.
Dubai, UAE
Al Jalila Hospital
Aermec air handling units
Moscow, Russia
European Medical Center
Aermec ANL chillers and over 240 fan coils
San Justo, Argentina · 2013
Hospital Italiano
3 chillers, air handling units and 162 fan coils
Namur, Belgium · 2012–2014
Saint Elisabeth Clinic
Aermec NRL chillers
Source: Aermec S.p.A. References Collection, entries authorised for publication.
Questions
By designing for it: at least one standby chiller and pump, isolation valves on every unit, and controls that rotate duty so a unit can be taken out of service without loss of cooling.
Yes. We take over maintenance of existing plant and plan replacements in phases so the building keeps running.